| AMEDSON BRIDGE DESIGN Sammamish, WA |
| CG Engineering provided the structural engineering design for two bridge crossings over wetland areas. The bridge deck spans were constructed with steel girders that were placed on exterior concrete abutment walls which spanned parallel to the roadway center line with an approximate length of 26 feet. We provided a bridge abutment foundation system designed on steel pilings in accordance with the geotechnical engineering recommendations. |