| MACKAYE HARBOR PIER Renovation |
| CG Engineering was chosen by the Tulalip Tribes of Washington to provide permitting services and structural engineering evaluation and design for the renovation of an existing pier approximately 12 feet wide & 700 feet long and several accompanying floats. The pier is wood framed with timber piles. Much of the renovation had been completed previously without a permit and the Army Corp of Engineers required an "after the fact" permit. This required a JARPA permit application & coordination with other state & federal agencies. |
| CG Engineering, PLLC - All Rights Reserved 250 4th Ave S. Suite 200, Edmonds, WA 98020 P: 425.778.8500 F: 425.778.5536 | Site Map | Home |

