| MEADOWDALE MARINA PIER RENOVATION Edmonds, WA |
| CG Engineering is providing the civil and structural engineering design for this project involving the renovation of the Meadowdale Marina Pier. Structural engineering design involves the replacement of 277 timber piles with 230 steel piles in the existing pier. Approximately 27,000 lineal feet of creosote treated pile caps and 45,000 square feet of timber decking will be removed. The adjacent concrete pier and metal building added in the 1970s will remain. A pedestrian walkway will be designed at one side of the access ramp. Steel deck grating will be designed for ambient light transmission for migrating salmonoids as required by the State Fish and Wildlife Department. Civil engineering design will include the layout for water, sanitary sewer, and storm sewer with water quality treatment located in the parking areas. The design of the sanitary sewer holding tank and pump station will be required to service the pier development. |
| CG Engineering, PLLC - All Rights Reserved 250 4th Ave S. Suite 200, Edmonds, WA 98020 P: 425.778.8500 F: 425.778.5536 | Site Map | Home |

