| PUD #1 BRIDGE REPLACEMENT Sultan, WA |
| CG Engineering provided structural engineering design for pipeline bridge abutments & foundations following WSDOT standards. The pre-fabricated steel bridge spans 240 feet over the Sultan River & supports HS-10 loading along with a 16-inch diameter water pipeline. 24 inch diameter augercast concrete pilings were used to support vertical & lateral loads. Construction engineering support services were provided to address soil conflicts in the field. |
| CG Engineering, PLLC - All Rights Reserved 250 4th Ave S. Suite 200, Edmonds, WA 98020 P: 425.778.8500 F: 425.778.5536 | Site Map | Home |

