PUD #1 BRIDGE REPLACEMENT
Sultan, WA

CG Engineering provided structural engineering design for pipeline bridge abutments & foundations following WSDOT standards. The pre-fabricated steel bridge spans 240 feet over the Sultan River & supports HS-10 loading along with a 16-inch diameter water pipeline. 24 inch diameter augercast concrete pilings were used to support vertical & lateral loads. Construction engineering support services were provided to address soil conflicts in the field.