| TULALIP MARINA PIER RENOVATION Marysville, WA |
| The Tulalip Marina pier is approximately 125 feet long and 25 feet wide and is attached to a 25 foot by 80 foot wharf along the shore. The wharf supports an existing 25 foot by 25 foot wood building at one end. The wharf and the pier each have 1 ton cranes mounted on the deck. The existing pier and wharf are made of timber deck supported on steel and timber piles. The original timber decking was overlaid with a concrete topping slab that had deteriorated to the point where it was nearly unusable. CG Engineering was retained to develop as-built drawings and to perform a condition survey of the pier. From this information we developed repair plans to bring the pier back into serviceable condition. We then calculated a load rating for the pier. We are also coordinating the permitting with the US Army Corps of Engineers. The client is now deciding whether to replace the timber structure with a new concrete pier on steel piles. |
| CG Engineering, PLLC - All Rights Reserved 250 4th Ave S. Suite 200, Edmonds, WA 98020 P: 425.778.8500 F: 425.778.5536 | Site Map | Home |