Commercial     Residential    Institutional    Telecommunication    Industrial    Public Works
THE GREGORY BUILDING


We were part of the design-build team providing civil and structural engineering construction documents for a 21,108 square foot, condominium/office building with one story of below grade parking and twenty-two condominium units. The parking level up to the first floor was constructed of concrete basement walls and a slab-on-grade floor. The upper residential floors are wood framed construction, utilizing plywood shear walls for seismic/wind resistance. Shoring consisting of cantilevered soldier piles was required.

In December 2005, a fire engulfed the building resulting in a total loss. CG Engineering provided engineering services for demolition and repairs to concrete slabs and walls and was involved throughout re-construction.






  CG Engineering, PLLC - All Rights Reserved   250 4th Ave S. Suite 200, Edmonds, WA 98020    P: 425.778.8500 F: 425.778.5536 Site Map Home  

more projects »