Commercial     Residential    Institutional    Telecommunication    Industrial    Public Works
AUTOMOTIVE COMMERCIAL CENTER DETENTION VAULT
Woodinville, WA

The Woodinville Auto Center storm water detention vaults posed several structural design challenges. One of the vaults was only partially buried so that the exposed wall could double as a retaining wall for the parking lot.

A concrete vehicle barrier extending up from the exposed vault wall also had to be designed for vehicle impact loading. Cast-in-place panels were required due to unusual jurisdictional requirements for placement of the access manholes. These panels had to be designed for fire truck loading, since they were located over the parking area.




  CG Engineering, PLLC - All Rights Reserved   250 4th Ave S. Suite 200, Edmonds, WA 98020    P: 425.778.8500 F: 425.778.5536 Site Map Home  

more projects »