SNOQUALMIE PUMP STATION
Snoqualmie, WA

This project included design and construction of a pump station building and a separate building to house generators. The pump station is a one story CMU building with a basement. The roof is metal deck over steel trusses. A traveling crane was designed to hoist pumps and pump equipment in and out of the structure. The main floor of the pump station is comprised of fiberglass grating supported by galvanized steel beams. The adjacent generator building is a single story CMU structure with light gauge metal trusses and steel roof deck. The generator building is supported on a concrete mat foundation.