| 11th AVE TOWNHOMES |
| This six unit townhome project consisted of two 3-story structures having a combined square footage of approximately 7,700 square feet. The buildings are predominately wood-framed with steel moment frames at the garages. The foundations are spread footings with slab-on-grade at the garage level. Several retaining walls were designed around the site. |
| CG Engineering, PLLC - All Rights Reserved 250 4th Ave S. Suite 200, Edmonds, WA 98020 P: 425.778.8500 F: 425.778.5536 | Site Map | Home |

