Commercial     Residential    Institutional    Telecommunication    Industrial    Public Works
GUYED TOWERS


We are able to determine the structural feasibility of mounting cellular antennas to existing towers. With a given antenna configuration, CG will perform a finite element analysis of the tower to determine its structural compliance with the current design standard, the ANSI/TIA/EIA-222.

A foundation analysis will also be performed, to determine its adequacy with the new loads.







  CG Engineering, PLLC - All Rights Reserved   250 4th Ave S. Suite 200, Edmonds, WA 98020    P: 425.778.8500 F: 425.778.5536 Site Map Home  

more projects »